September
12, 2003:
Sienna Point Condominiums will become 95 suites
larger with the addition of the third phase.
All three phases use the TCS system. This third
phase will add to the existing 123 suites. The developer
of the condominium is Castle Developments and the
HVAC will be installed by Petrin Mechanical of Edmonton,
Alberta.
<<Back
|
|
Total Comfort Solution Inc.
83 - 4th Ave.
West
Box 2730
Cardston, Alberta
T0K 0K0
Call Toll Free 877-653-3455
|